← Volver
04/07/2019

FCC Construcción and the extension project of dock of the port of Barcelona, protagonists in the report of TV3

FCC Construcción and the extension project of dock of the port of Barcelona, protagonists in the report of TV3

FCC Construcción and its extension project of dock of the Port of Barcelona, have been protagonists of a special report made by TV3.

The Extension of the Dock 3ª Phase, consists of the prolongation towards the south of the dock Adosado 2B, at the moment in construction. It consists of an alignment of about 476 meters in total length of 12 meters draft and includes a Ro-Ro heel of 60 meters in length.

The stretch located to the north of the heel and that gives continuity to the Adosado 2B dock is about 364 meters and the stretch located to the south of 52 meters.

Likewise, the project contemplates the extension of the rear esplanade of the Adosado 2B quay in a length of about 480 meters, topped by a closing mote perpendicular to the quay.

We invite you to see the report at: https://www.ccma.cat/tv3/alacarta/programa/marisol-i-helena-els-calaixos-de-4-000-tones-de-formigo-que-floten/video/5876644/

FCC Construcción and the large port infrastructures

FCC Construcción has extensive experience and capacity in the design and construction of port infrastructures. In addition to the commented port of Granadilla, FCC Construcción has executed Puerto Acu (Brazil), which is the largest port complex in the Americas and one of the most important in the world. It currently receives ships of up to 400,000 tons of cargo.

Also, the construction area executed the extension of Puerto del Callao, in Peru, considered one of the most important ports in Peru and one of the largest in the Pacific. Reaching the capacity of one million containers per year in the north dock.